EngRadardirect-apply

Project Scheduler (Mission Critical)

Clark/wd503/clarkexternal

Clark/wd503/clarkexternal is the employer — EngRadar is a job radar, not a recruiter. We track this posting from their own careers page and send you straight there; we never handle applications or CVs.

McLean, VA Posted 17d ago

The Project Scheduler will lead the planning & scheduling efforts on multiple high impact projects. This role will also actively contribute to Corporate Initiatives including, but not limited to, training development and delivery, data analytics, trend identification and reporting.

Responsibilities

  • Understand and implement accepted Planning & Scheduling Best Practices 

  • Analyze drawings, specifications, and statements of work in the preparation and acceptance of usable Baseline schedules for construction

  • Monitor multiple project schedules being developed and updated by Operations staff and provide guidance as necessary

  • Interact with the Operations team and represent Clark and its partners in the best manner to owners, subcontractors, and their representatives

  • Support the development of conceptual bid and proposal schedules with executive management and present to selection committees if required

  • Utilize analytics to identify and report on project trends

  • Effectively cost and manpower load schedules for use during the execution of the project

  • Evaluate the actual construction status relative to proposed plan

  • Analyze and communicate the impact of changes to the schedule

  • Prepare Time Impact Analyses per recommended practices by commonly accepted standards

  • Travel to project sites.

  • Develop and deliver specialized Planning, Scheduling and other Project Controls training for Clark Corporate University

  • Critique, create, and recommend improvements to departmental policies and procedures.

  • Be responsible for special projects and other departmental duties as necessary

Basic Qualifications

  • Undergraduate degree in Engineering, Architecture, Construction Management or a related discipline preferred

  • 3+ years scheduling experience on commercial construction projects

  • Proven success implementing strategic initiatives

  • Detail oriented and can manage multiple priorities in a fast paced environment with minimal guidance

  • Skilled at developing and maintaining relationships with owners, subcontractors, senior leaders and project teams

  • High degree of initiative, personal responsibility, and integrity

  • Advanced proficiency in Primavera (P6) software

  • Alignment to Clark Standards of Excellence: Self-Motivated, Results Oriented, Adaptable, Team Player, Accountable, Ethical, Innovative, Resilient, Builds Relationships, Builds People / Teams & Followership, Sets Direction & Executes

The work environment and requirements described below are representative of those necessary for an employee to successfully perform the essential functions of this role. 

The Physical Side of the Role: This is an active, hands-on role. You can expect to be on your feet frequently, navigating active job sites with uneven terrain, stairs, ladders, and hoists. The work is physically demanding and requires a full range of motion, including bending, kneeling, and reaching. You’ll need to be comfortable frequently lifting and carrying materials up to 25 pounds, and occasionally up to 50 pounds. This role requires the ability to communicate effectively, as well as visual acuity for reading plans and inspecting work. The role does include desk time in the office that may require prolonged periods of sitting for tasks like computer work, document review, and meetings.

Your Work Environment: You’ll spend a significant amount of your time on active construction sites, which means being adaptable to all kinds of weather and moderate to loud noise levels, and comfortable in elevated or confined work areas with moving mechanical equipment and with the fast-paced nature of a project in progress. You will also spend time in a typical office setting with moderate noise levels. Your safety is our top priority, and you'll be expected to follow Clark Construction's safety policies and procedures, and all applicable laws, at all locations.

Our High-Performing Culture: This is a demanding, high-performance environment. We are looking for candidates who are energized by challenge, thrive under pressure, and are prepared to do what it takes to achieve exceptional results. Success in this role requires significant commitment, including flexibility to work extended hours, especially during critical project phases or client deadlines. Beyond regular working hours, there will be occasions where business needs require your attention, particularly for time-sensitive matters or emergencies. You are expected to monitor and respond to communications (phone calls, emails, text messages) as required to address these situations effectively. Your ability to manage these expectations and be responsive when critical issues arise is key to your success in this role and our collective success as a team.


A Drug Free Workplace: Clark promotes a drug free workplace. A pre-employment drug “fitness for duty” screening is required, and the company conducts random quarterly drug “fitness for duty” tests. 

#LI-LG1

Posted by Clark/wd503/clarkexternal on their own careers page — you apply directly, no recruiter in between. View original / apply →

More at Clark/wd503/clarkexternal