EngRadardirect-apply

Project Scheduler III

Blueorigin/wd5/blueorigin

Blueorigin/wd5/blueorigin is the employer — EngRadar is a job radar, not a recruiter. We track this posting from their own careers page and send you straight there; we never handle applications or CVs.

Space Coast, FL Posted 4d ago

Application close date:

Applications will be accepted on an ongoing basis until the requisition is closed.

At Blue Origin, we envision millions of people living and working in space for the benefit of Earth. We’re working to develop reusable, safe, and low-cost space vehicles and systems within a culture of safety, collaboration, and inclusion. Join our team of problem solvers as we add new chapters to the history of spaceflight!  

This role is part of Blue Origin corporate functions, providing centralized support across Blue Origin business unit teams, functions, and locations.

Blue Origin is seeking an expert Project Scheduler III to own the project execution schedule from design through construction turnover for mission-critical aerospace facilities. This role builds and maintains the roadmap that guides the team on what must be decided, released, procured, and built next — and when — to protect required completion dates for programs including PPF, Horizon, VIF, and other strategic projects.


The Project Scheduler develops Level 2/3 executive schedules and detailed Level 4 construction schedules using CPM methodology. This is a leadership-facing project controls role that challenges assumptions, validates logic, and drives decisions — not just a software operator role. You will work in lockstep with the Preconstruction Estimator to provide integrated schedule and cost impact analysis for all major decisions.


We are looking for someone to apply their technical expertise in the following ways:

Design Phase Schedule Development

You will build Level 2 executive schedules showing strategy, phases, and key milestones visible to leadership, and develop Level 3 integrated project schedules covering design, permitting, procurement, construction, commissioning, and turnover. You will create Level 4 design work package schedules planning backward from construction need dates, and establish a milestone register with decision points, release dates, procurement awards, and delivery requirements. A critical responsibility is validating all schedule assumptions and converting unresolved assumptions to risks before they become problems.

Construction Phase Schedule Management

You will develop contract-compliant CPM baseline schedules with proper logic, sequencing, and critical path, and perform monthly schedule updates including progress measurement, logic validation, and critical path review. You will prepare 3-week look-ahead schedules for field coordination and constraint identification, conduct time impact analyses (TIAs) for changes, delays, and unforeseen conditions, and develop recovery schedules when the critical path is threatened.

Schedule Analysis & Reporting

You will perform critical path analysis and float consumption tracking, and identify near-critical paths and activities that threaten project milestones. You are expected to challenge schedule logic, unusual constraints, and questionable sequencing, and surface schedule risks including interfaces, long-lead items, and pending decisions. You will present schedule status, risks, and needed decisions to executive leadership monthly.

Integrated Project Controls

You will partner with the Preconstruction Estimator to provide joint cost and schedule impact analysis for all changes, and support the procurement team with bid package schedules, award timing, and long-lead tracking. You will coordinate with Superintendents on construction sequencing, constraints, and progress verification, and support commissioning and operations on testing, training, and turnover timing.


Minimum Qualifications

  • Bachelor's degree in Construction Management, Engineering, Architecture, or related field, or equivalent professional experience
  • 5+ years of CPM scheduling experience on commercial, industrial, or mission-critical projects including both design and construction phases
  • Advanced proficiency in Oracle Primavera P6; working knowledge of Microsoft Project
  • Proven experience developing schedule baselines, monthly updates, fragnets, and Time Impact Analyses (TIAs)
  • Working understanding of design deliverables, procurement cycles, submittal processes, construction sequencing, and commissioning
  • Strong written and verbal communication skills with ability to present schedule status and risks to executives
  • Ability to challenge project teams on logic, assumptions, and release timing
  • Ability to travel occasionally to project sites (up to 15%)

Preferred Qualifications

  • AACE Planning & Scheduling Professional (PSP) or PMI Scheduling Professional (PMI-SP) certification
  • Design-build, CM-at-risk, or integrated services delivery experience
  • Delay analysis, forensic scheduling, or claims support experience
  • Experience with schedule analytics tools (e.g., Acumen Fuse, Schedule Analyzer, or AI-assisted review tools)
  • Aerospace, defense, industrial, or mission-critical facility construction experience (cleanrooms, high bay facilities, propellant systems, launch infrastructure)
  • Experience on federal or government construction projects
  • Understanding of Lean construction, Last Planner System, or pull planning
  • Experience supporting owner's project management and construction oversight

Culture Statement

Don’t meet all desired requirements? Studies have shown that some people are less likely to apply to jobs unless they meet every single desired qualification. At Blue Origin, we are dedicated to building an authentic workplace, so if you’re excited about this role but your past experience doesn’t align perfectly with every desired qualification in the job description, we encourage you to apply anyway. You may be just the right candidate for this or other roles.


Export Control Regulations

Applicants for employment at Blue Origin must be a U.S. citizen or national, U.S. permanent resident (i.e. current Green Card holder), or lawfully admitted into the U.S. as a refugee or granted asylum.


Background Check

  • Required for all positions: Blue’s Standard Background Check
  • Required for Certain Job Profiles:  Defense Biometric Identification System (DBIDS) background check if at any time the role requires one to be on a military installation
  • Required for Certain Job Profiles: Drivers who operate Commercial Motor Vehicles with a Gross Vehicle Weight (GVW), Gross Vehicle Weight Rating (GVWR) or combination of power unit and trailer that meets or exceeds 10,001 lbs. and/or transports placardable amounts of hazardous materials by ground in any vehicle on a public road while in commerce, may be subject to additional Federal Motor Carrier Safety Regulations including: Driver Qualification Files, Medical Certification (obtained before onboarding), Road Test, Hours of Service, Drug and Alcohol Testing, vehicle inspection requirements, CDL requirements (if applicable) and hazardous materials transportation/shipping training.
  • Required for certain Job Profiles: Ability to obtain and maintain Merchant Mariner Credential, which includes pre-employment and random drug testing as well as DOT physical

Benefits

  • Benefits include:  Medical, dental, vision, basic and supplemental life insurance, paid parental leave, short and long-term disability, 401(k) with a company match of up to 5%, and an Education Support Program.
  • Stock Options for all regular employees (working at least 20 hours/week)
  • Paid Time Off:  Up to four (4) weeks per year based on weekly scheduled hours, and up to 14 company-paid holidays.
  • Dependent on role type and job level, employees may be eligible for benefits and bonuses based on the company's intent to reward individual contributions and enable them to share in the company's results, or other factors at the company's sole discretion. Bonus amounts and eligibility are not guaranteed and subject to change and cancellation. Please check with your recruiter for more details.

Equal Employment Opportunity

Blue Origin is proud to be an Equal Opportunity/Affirmative Action Employer and is committed to attracting, retaining, and developing a highly qualified and dedicated work force. Blue Origin hires and promotes people on the basis of their qualifications, performance, and abilities. We support the establishment and maintenance of a workplace that fosters trust, equality, and teamwork. We provide all qualified applicants for employment and employees with equal opportunities for hire, promotion, and other terms and conditions of employment, regardless of their race, color, religion, sex, sexual orientation, gender identity, national origin/ethnicity, age, physical or mental disability, genetic factors, military/veteran status, or any other status or characteristic protected by federal, state, and/or local law. Blue Origin will consider for employment qualified applicants with criminal histories in a manner consistent with applicable federal, state, and local laws, including the Washington Fair Chance Act, the California Fair Chance Act, the Los Angeles Fair Chance in Hiring Ordinance, and other applicable laws. For more information on “Know Your Rights,” please see here.


Affirmative Action and Disability Accommodation

Applicants wishing to receive information on Blue Origin’s Affirmative Action Plans, or applicants requiring a reasonable accommodation in order to participate in the application and/or interview process, please contact us at [email protected]. Please note this is a publicly managed inbox. Please do not include any personal medical information in your request.

Posted by Blueorigin/wd5/blueorigin on their own careers page — you apply directly, no recruiter in between. View original / apply →

More at Blueorigin/wd5/blueorigin